Cable avoidance hire software

Cable avoidance hire software, booked before the ground is broken.

Hire brokers placing cable avoidance work can take the groundworker’s booking, then cover the locator and signal generator from their own kit, another depot, a cross-hire, or the optional RiQ Network. Hire shops that already stock this kit run the same storefront, with live availability and online booking on their own domain. RiQ (pronounced “Rick”) is fully cloud-based, with nothing to install.

Take the groundworker’s booking

A groundworker, utility contractor or builder asks for a cable avoidance tool and a signal generator, often called a CAT and genny, plus a clamp, a sonde or an earth stake. The signal generator in this hire puts a trace on a buried service. It is a different job from a site generator. Hire shops that keep locators on their own shelves use the same storefront. Set the locator, the signal generator and the accessories that have to travel with them up as a bundle with required items, so live availability is checked for every piece, and offer further accessories at checkout with Upsell & Bundles Pro. Customers turn the basket into a quote, emailed with a PDF and saved in their account, with the quoted price held until it expires. They book on your own domain, choose delivery or click and collect, and business customers can pay by invoice through Billie. The checkout is the one already running hire at National Tool Hire and Mammoth Hire.

  • Bundles and required items
  • Add-ons at checkout (Upsell & Bundles Pro)
  • Customer quotes, emailed with a PDF
  • Delivery or click and collect
  • Pay by invoice through Billie

Cover the locator, wherever it sits today

Cover the hire from your own kit or another depot. Cross-hire a locator from another hire company, or use the optional RiQ Network: you can receive partner jobs on every plan, and route a job to a partner on Core and Enterprise. Change a booking after it is made and the customer approves or declines the change online, with the price locked from checkout. Regular contractors stay on trade accounts and credit terms, and the hire can be extended, exchanged or part-returned without rekeying it.

  • Own kit, another depot, cross-hire, optional RiQ Network
  • Receive partner jobs on every plan
  • Route jobs to partners on Core and Enterprise
  • Booking changes the customer approves online
  • Trade accounts and credit terms

Suitable steps before anyone breaks ground

Part 4 of the Construction (Design and Management) Regulations 2015 applies only to a construction site (regulation 16(1)). A contractor carrying out construction work must comply with the requirements of this Part so far as they affect the contractor or any worker under the control of the contractor or relate to matters within the contractor’s control (regulation 16(2)). A domestic client who controls the way in which any construction work is carried out by a person at work must comply with the requirements of this Part so far as they relate to matters within the client’s control (regulation 16(3)). Where necessary to prevent danger, energy distribution installations must be suitably located, periodically checked and clearly indicated (regulation 25(1)). Where there is a risk to construction work from overhead electric power cables, they must be directed away from the area of risk, or the power must be isolated and, where necessary, earthed (regulation 25(2)). If it is not reasonably practicable to comply with regulation 25(2)(a) or regulation 25(2)(b), suitable warning notices must be provided together with one or more of the following: barriers suitable for excluding work equipment which is not needed, suspended protections where vehicles need to pass beneath the cables, or measures providing an equivalent level of safety (regulation 25(3)). Construction work which is liable to create a risk to health or safety from an underground service, or from damage to or disturbance of it, must not be carried out unless suitable and sufficient steps (including any steps required by regulation 25) have been taken to prevent the risk, so far as is reasonably practicable (regulation 25(4)). The explanatory note to the Regulations says they implement in Great Britain the requirements of Directive 92/57/EEC. HSE’s underground electrical cables guidance says damage to underground electrical cables can cause fatal or severe injury, and that the law says you must take precautions to avoid danger. It says this can be achieved by a safe system of work based on planning, use of plans, cable locating devices and safe digging practices, and that these four elements complement each other and should all be used when working near buried cables. The same page says people who use a locator should have received thorough training in its use and limitations, and that locating devices should always be used in accordance with the manufacturer’s instructions, regularly checked and maintained in good working order. That HSE page is about electrical cables. Regulation 25(4) applies to an underground service, and HSE’s HSG47, third edition, published in 2014, is the guidance for work on or near underground services. HSG47 is aimed at all those involved in commissioning, planning, managing and carrying out work on or near underground services, and it is also of use to the owners and operators of such services. It explains three basic elements of a safe system of work during excavation: planning the work, locating and identifying buried services, and safe excavation. Which steps are suitable and sufficient on a site sits with the contractor, or with a domestic client where regulation 16(3) applies. RiQ keeps the hire side in order: workshop and servicing records sit on the asset, and hire documents you attach stay on the booking with the delivery and the invoice.

  • Workshop and servicing records on the asset
  • Hire documents you attach stay on the booking
  • Condition photos at handover and return

Back in the yard, and into the accounts

When the hire ends, the customer requests collection and condition photos show how the locator and signal generator came back. WhatsApp templates carry the delivery and return messages. A review campaign sends the post-hire review request. Contracts and invoices are generated from the hire, and invoices sync to Xero. We connect Sage or QuickBooks when you want them.

  • Customer collection requests
  • Condition photos at handover and return
  • WhatsApp templates for delivery and return messages
  • Review campaigns
  • Invoices sync to Xero
  • Sage or QuickBooks set up when you want them

Sources

Checked 7 Nov 2026. The explanatory note says these Regulations implement in Great Britain the requirements of Directive 92/57/EEC. This page summarises the Regulations and HSE guidance and is not legal advice. Check the full text and HSE guidance for how they apply to a hire yard or a site.

Waitlist

Get in early.
Get it right.

Join the RiQ waitlist for early access and a switching review at no cost. It takes about a minute.

All fields are required unless marked optional.

Step 1 of 3: About you

1. About you

2. Your business

What do you hire out?

Choose all that apply.

How many depots do you run?
How many people would need RiQ access?

Owners, depot staff, workshop and office. Anyone who would log in day to day.

3. Interests

What are you interested in?
Which apps would you like to hear about? (optional)
Staying in touch (optional)

We only use your details for the RiQ waitlist and never sell them. Read our privacy notice.

Join the waitlist