Trench shoring hire software
Trench shoring hire software, with the records on every box and strut.
Trench boxes, manhole boxes, trench sheets, hydraulic struts and road plates go out to groundworkers, utility contractors and drainage firms, usually as a full system for one dig. RiQ (pronounced “Rick”) keeps the kit, its records and the invoice on one hire. Fully cloud-based, with nothing to install on your premises.
Your customers work in excavations under CDM
Under the Construction (Design and Management) Regulations 2015, all practicable steps must be taken to prevent danger to any person, including, where necessary, the provision of supports or battering, so that no excavation collapses, no material forming its walls or adjacent to it is dislodged or falls, and no person is buried or trapped (regulation 22(1)). Suitable and sufficient steps must be taken to prevent people, work equipment or material falling into the excavation (regulation 22(2)) and to prevent the excavation or the ground next to it being overloaded (regulation 22(3)). Where supports or battering have been provided, construction work must not be carried out in the excavation unless it, and any work equipment and materials that may affect its safety, have been inspected by a competent person at the start of the shift, after any event likely to have affected its strength or stability and after any material unintentionally falls or is dislodged (regulation 22(4)). Where the inspector is not satisfied the work can be carried out safely, they must inform the person the inspection was for before the end of the shift and provide a report within 24 hours (regulation 24(1)), and the person the inspection was for must keep that report available for an HSE inspector, at the site until the work is completed and for 3 months after that (regulation 24(3)). RiQ keeps your side of it in order: inspection records and handover paperwork are attached to every box, sheet and strut, so the customer gets them with every hire.
- Workshop and servicing records
- Handover paperwork attached to every unit, every hire
- Certificates sent with the hire (on the roadmap)
- Condition Photos app at handover and return
The whole shoring system, on one booking
A trench box rarely goes out alone: base and top panels, struts, extension panels, lifting chains and road plates often go with it. Set these up as bundles and required items so they are added to every booking automatically and availability is checked for every piece, and offer add-ons at checkout with Upsell & Bundles Pro.
- Bundles and required items
- Add-ons at checkout (Upsell & Bundles Pro)
- Multi-depot availability and transfers
Long digs on trade accounts
Shoring stays in the ground for as long as the dig takes, and the job often grows. Keep contractors on trade accounts and credit terms, extend, exchange or part-return a hire with the price locked as sections come out, and let customers request collection themselves when the trench is backfilled.
- Trade accounts and credit terms
- Off-hire, exchange, extension and partial returns
- Customer collection requests
- Cross-hire and partner network overflow
Delivery and collection, planned
Trench boxes and road plates are heavy and go out on a truck. Schedule delivery and collection across depots, take condition photos at handover and return, and send delivery ETAs and return reminders by SMS or WhatsApp.
- Delivery and collection scheduling
- SMS & WhatsApp Notifications app
- Condition photos at handover and return
Sources
- Construction (Design and Management) Regulations 2015, regulation 22 (excavations)
- Construction (Design and Management) Regulations 2015, regulation 24 (reports of inspections)
Checked 25 Oct 2026. This page summarises the Regulations and is not legal advice. Check the full text and HSE guidance for how they apply to your equipment.
Waitlist
Get in early.
Get it right.
Join the RiQ waitlist for early access and a switching review at no cost. It takes about a minute.